|
|
| Wireless Path / Radio Site Surveys |
|
| The foundation of a reliable radio network is
the RF Site Survey. The Customer Support engineer performs on-site measurements and
analysis to determine factors needed to design the RF data communications system including
RF signal levels between all nodes, co-channel emitter frequencies, their signal
strengths, and RF data quality. Additional design input is given on antenna selection and
location, feedline requirements, and lightning/power protection for |
 |
| each node, as well as specific
installation requirements as dictated by the customer's application. After completion of
the analysis, a formal Site Survey Report is prepared to document the above findings and
the installation/hardware requirements for the site. |
|
|
|
| Custom Terminal/Wire Markers & Labeling |
|
| IEC Supply offers Custom Label
Printing. Phoenix Contact, Allen Bradley or Weidmuller compatible. No minimum or maximum
quantity restrictions, no waiting for long factory deliveries or extra shipping costs.
Free custom design software - CLIP PROJECT
advanced. Order your custom wire markers by 10:00 am and pick up by 2:00 pm. (Subject
to blank marker availability) |
 |
| Contact any inside sales
representative for price and availability. |
|
| Cut-to-length DIN Rail |
|
IEC Supply offers Custom Cut Din
Rail with no cutting fees! How does this benefit you?
Cut lengths to your specifications, no minimum or maximum cut din rail quantities,
no cutting fees, no outrageous in-bound freight charges. Save on YOUR time and YOUR labor. |
 |
| Contact any inside sales
representative for price and availability. |
|
| Variable Speed Drive Startup |
|
Proper start up sequence of your
VFD will impact many elements of your total operation.
IEC Supply wants to help you be sure this is a productive experience. IEC Supply
offers
VFD start up service done by our own on site factory trained technician. This
service not only provides factory approved start up practices it may also extend the drive
warranty by one (1) full year from date of installation. Call our sales department for a
quotation and get your drive in the start up schedule now. |
 |
|
|
| Arc Flash Study |
|
Customers perform Arc Flash
Studies because:
NFPA-70E rules require Arc Flash Labels on electrical equipment.
OSHA enforces the rules in the 2009 NFPA-70E. Your plant needs to become compliant!
Call IEC Supply and find out how cost effective it is to become ARC FLASH compliant while
educating and training employees on safety. |
 |
|
|
|
|
|
|
|
|
|